
We are exhibiting at UK Metals Expo
The site includes two high-specification covered warehouses:
- New facility (6,500 m²) – capacity for 1700 steel coils
- Original warehouse (5,000 m²) – capacity for 1400 steel coils
- Outdoor plots – for handling scrap, billets, slabs and other steel products
- Annual throughput capacity: approximately 950,000 tonnes
Fully rail connected, the Wolverhampton centre can receive up to five trains per day, each carrying up to 1300 tonnes of steel.
This enables a high volume, rapid turnaround solution for manufacturers serving downstream markets such as automotive, domestic appliances, heating systems, and food packaging across the UK.